Control every job from scope through final inspection.

Electrical work spans short service calls, permitted upgrades, and multi-stage commercial projects. Each job needs explicit scope, safety records, approval gates, crew assignments, and billing milestones.

Permits, safety records, approvals, and billing gates advance with the work.

Discuss an operation

Handoffs lose the information required for the next decision.

Intake, field work, approvals, scheduling, documentation, and billing lose context when separate tools control each step. These issues define the first areas to inspect with a electrical team.

  • 01

    Small service calls and multi-day installs use the same loose process

  • 02

    Dispatch lacks current permit and inspection status

  • 03

    Crew notes and panel photos are hard to retrieve later

  • 04

    Change orders are tracked outside the core estimate record

Connect the operation around one job record.

A shared job record can connect intake, planning, execution, approvals, billing, and closeout while preserving the history of every decision.

What the system can own

  • Service vs project workflow lanes
  • Permit and inspection status checkpoints
  • Change-order tracking tied to estimates
  • Field photo and documentation timeline per job

What it can consolidate

  • Disconnected project trackers
  • Manual permit status boards
  • Standalone field photo apps
  • Separate estimate revision documents

Each workflow has explicit states and owners.

Workflow 01

  1. Panel upgrade lead
  2. scope visit
  3. permit milestone
  4. install scheduling
  5. final inspection
  6. invoice

Workflow 02

  1. Service call intake
  2. technician assignment
  3. safety checklist
  4. completion and notes
  5. payment request

Workflow 03

  1. Commercial estimate
  2. phased approvals
  3. crew allocation
  4. milestone billing

Structured intake

Service calls, upgrades, and commercial projects enter distinct intake paths with the scope, site conditions, documentation, and next decision recorded from the start.

Operational visibility

Track permit-cycle delays, change-order frequency, crew utilization, and milestone billing conversion.

Controls and accountability

Permission controls protect financial data while preserving field visibility for crews and project managers.

Implementation questions

Can this handle both residential and commercial jobs?
Residential service, residential projects, and commercial work can use different stages while sharing customer, property, and reporting records.
Can permit steps be built into the process?
Permit, inspection, and approval records can act as required gates before scheduling or billing advances.